Hi,
is there any way to copy (all) hotspots from a .p2vr project file (v3, one project file out of many associated of one tour)
into a v4 project file (to the selected pano)?
As I often used hs for text-fields, external loaders, special functions and so on, so there are sometimes many lines written inside a hs, so it would be an enormous time-saver, if there is way to do that.
Any known way?
Thanks a lot!
Copy hotspots from V3 to V4 ?
- soulbrother
- Posts: 547
- Joined: Tue Apr 08, 2008 7:01 pm
- Location: München
- Contact:
- Attachments
-
- Zwischenablage02.jpg (234.83 KiB) Viewed 39282 times